We fabricate assemblies, make replacement components in quantity, build custom pipe spools and structural steel, and rebuild equipment for public works, utilities, and infrastructure contractors.

Start with the drawings, failed part, existing system, quantity, schedule, and the result the finished work must produce.

Fire-service water tank mounted on a truck inside the Barnes Welding shop

Who we support

The teams responsible for equipment the public relies on

An obsolete part, multi-process repair, or one-off component can begin with the failed equipment and the result it needs to produce.

Capabilities for this market

Public works fabrication, machining, and repair

A repair can move from measurement and machining to forming, welding, and final fit-up. We review the whole assembly before deciding which shop processes belong in the job.

View capabilities

Problems we help solve

The failed part can be the starting point

Bring the worn part, damaged assembly, or equipment information. The first step is understanding what failed and what has to go back into service.

Equipment fabrication & repair

Shop work around the equipment

Municipal and infrastructure work can involve a single component, an existing assembly, or equipment that needs a practical path back into service.

Large helical steel component undergoing fabrication in the Barnes Welding shop
Yellow industrial equipment assembly with wheels in the Barnes Welding shop
Custom fabricated fish-transfer pipe spools installed in an existing system

Featured project

Custom fish-transfer pipe spools

Custom rolled and flanged pipe spools were fabricated to match an existing public-infrastructure fish-transfer system.

Problem
The fish-transfer system required pipe spools that matched an existing nonstandard diameter, so standard pipe was not the right fit.
Barnes scope
Barnes rolled custom shells and fabricated the flanged spool assemblies around the required application.
Result
The finished custom-diameter assemblies matched the existing system. The required size became a fabricated component rather than a catalog search.

Related projects

Shop work in this market

Municipal & public infrastructure

Mini-excavator bucket restraint

A folding, lockable bucket restraint replaced variable tie-down straps with a repeatable standard on an equipment trailer.

View project
Municipal & public infrastructure

Custom replacement worm gear

Barnes machined a replacement worm gear for municipal equipment when the original part could not be sourced.

View project

From the shop to the equipment

Build it, then check the fit

These two views show a fabricated attachment in the shop and the same assembly installed on an excavator bucket.

Fabricated black steel attachment assembly in the Barnes Welding shop
Fabricated steel attachment installed on an excavator bucket

Applications

Planned fabrication and repair work

Public work can start with a bid package, a required quantity, an existing system that must be matched, or equipment that needs a practical rebuild.

Fabricated assemblies

Frames, restraints, supports, equipment modifications, and project-specific assemblies built from the supplied requirements.

Replacement components

Machined or fabricated components made as one part or in a defined quantity when the original is obsolete or difficult to source.

Pipe spools & structural steel

Custom-diameter flanged spools, equipment supports, brackets, embeds, and structural components for public infrastructure work.

Equipment rebuilds

Inspection, machining, fabrication, hydraulics, straightening, and fit-up planned around the assembly and the work it must return to.

Infrastructure fabrication

Large work, handled carefully

This large assembly documents the scale and coordination involved in project-specific infrastructure work.

Large structural assembly with a worker at an installation site
Barnes Welding shop work

A practical replacement path

Start with the damaged component

A worn component may need inspection and measurement before a replacement can be machined. A damaged assembly may need straightening, cutting, fabrication, hydraulics, or finishing. We plan those operations around the equipment and job scope.

  1. Inspect
  2. Measure
  3. Plan
  4. Repair or make
  5. Verify
Barnes Welding project work

Need a repair or replacement component?

Bring us the part and show us what it has to do

Share the equipment, failure, photos, drawings, timing, and required result. We’ll review the repair or replacement path.